The Highway 47 bridge over the Missouri River at Washington reopened about 9 a.m. Saturday morning after closing for less than hour.

According to Missouri Department of Transportation Area Engineer Judy Wagner, a barge supporting a large crane shifted near the bridge. It was closed as a precaution.

The crane is being used during the construction of the new bridge.