Board to Study Sewer, Water Connection Fees - The Missourian: Local News

default avatar
Welcome to the site! Login or Signup below.
|
||
Logout|My Dashboard

Board to Study Sewer, Water Connection Fees

Print
Font Size:
Default font size
Larger font size

Posted: Thursday, June 13, 2013 8:00 am

The Washington Board of Public Works will further study changing the water and sewer connection fees charged by the city and will not recommend taking over grinder pumps in proposed annexation areas.

Jim Briggs, city administrator, brought the fees to the board’s attention Tuesday in an attempt to try and figure out the cost for those who may be brought into the city’s system through annexation.

Subscription Required

An online service is needed to view this article in its entirety. You need an online service to view this article in its entirety.

Have an online subscription?

Login Now

Need an online subscription?

Subscribe

Login

You must login to view the full content on this page.

Thanks for visiting The Missourian. You are entitled to view 20 free articles every 30 days. Currently, you have (%remaining%) free articles remaining, (%remaining_reg%) before being asked to register, and (%remaining_sub%) before being asked to subscribe). If you are already a print subscriber, you get FREE access after registering. If you are not yet a print subscriber you can purchase an affordable online subscription to receive full access to emissourian.com & a digital replica of The Missourian. You need an online service to view this article in its entirety.

Have an online subscription?

Login Now

Need an online subscription?

Subscribe

Login

/local_news
;