New Bend Bridge to Be Built in 2015 - The Missourian: Pacific

default avatar
Welcome to the site! Login or Signup below.
|
||
Logout|My Dashboard

New Bend Bridge to Be Built in 2015

Print
Font Size:
Default font size
Larger font size

Posted: Friday, August 8, 2014 11:00 am

Construction is set to begin in 2015 to build a new bridge over the Meramec River at Pacific, according to Franklin County Presiding Commissioner John Griesheimer.

The old Bend Bridge, built in 1918, will be replaced with a new bridge, located a few hundred yards southeast of the old structure.

Subscription Required

An online service is needed to view this article in its entirety. You need an online service to view this article in its entirety.

Have an online subscription?

Login Now

Need an online subscription?

Subscribe

Login

You must login to view the full content on this page.

Thanks for visiting The Missourian. You are entitled to view 20 free articles every 30 days. Currently, you have (%remaining%) free articles remaining, (%remaining_reg%) before being asked to register, and (%remaining_sub%) before being asked to subscribe). If you are already a print subscriber, you get FREE access after registering. If you are not yet a print subscriber you can purchase an affordable online subscription to receive full access to emissourian.com & a digital replica of The Missourian. You need an online service to view this article in its entirety.

Have an online subscription?

Login Now

Need an online subscription?

Subscribe

Login

/local_news/pacific
;